Flare Shroud Tank Replacement
Key Capabilities
Project Management
On-site Installation
Self-Perform – Staff and Trade
Specialist subcontractor engagement
Commissioning
Overview
Our client is a prominent Gas explorer, producer and supplier of Gas to the Australian domestic market. As part of the acquisition of an existing gas processing plant in the South West of Victoria, our client required the tank that encompasses the flare to be replaced. Vecta were engaged to undertake the complete on-site works, with the new flare tank being free issued.
Scope
Removal and disposal of existing tank, 12m diameter and 16m tall
Workshop verification of new tank
Installation of tank on site
QA / QC of site installation
Pre-commissioning and, commissioning of final unit
Challenges
There was a lack of definition in each document’s scope during the early phases of the project.
Existing documents were based on major project execution processes which needed to be significantly modified to reflect a simpler approach.
Other obligations that the Client had to fulfill only afforded them a limited amount of time to review, provide comments and approve documents prior to the final issue. Hence, the established timeframe for review cycle was difficult to adhere to.
Solutions
Vecta Group self performed:
Project management
Demolition procedure, and Installation process inclusive of:
Work Pack Development
Isolation / LOTO
Safe Work Method Statement
JSEA
QA / QC scope
NDT requirements
Vecta self performed the work with skilled and experienced Staff, Supervision and Trade resources. Vecta engaged and managed all of the specialist subcontractors including cranes, insulation and cladding, surface treatment and NDT.
Outcomes
With over 3,500 man hours of site work required, and the risk associated with this type of work on a major hazard facility, Vecta are proud that the project was delivered for our client safely, on time and within budget.