F34 Jet Fuel Dosing
Key Capabilities
Project Management
Process Design
Mechanical and Piping Owners Engineer
Electrical, Instrumentation Owners Engineer
Vendor and Contractor Management
Construction Management
Commissioning
Overview
Vecta Group was engaged to design, construction manage, and commission a new permanent F34 dosing facility at Viva Energy’s Pinkenba Terminal, following the successful delivery of a temporary system.
Scope
The scope included:
Front End Engineering Design (FEED) and detailed design
HAZOP facilitation and documentation
Process engineering design
Owners engineer to review and approve the mechanical, piping, instrumentation and controls design
Tender preparation and technical/commercial bid evaluation
Site installation supervision
Commissioning and operational procedures
Project QA and closeout
Challenges
The project required delivery within a compressed timeframe while coordinating multiple stakeholders. Installation was undertaken in a live operational environment, requiring careful planning to maintain safety and site access.
Solutions
Vecta led coordination across all stakeholders, ensuring alignment throughout design and delivery. A modular, off-site construction approach was implemented to reduce on-site installation time, improve safety, and maintain schedule.
Outcomes
The F34 dosing system was delivered on time and on budget with zero incidents. The solution enabled the client to meet operational requirements and respond effectively to market demand.