MHF FOAM SUPPRESSION SYSTEM UPGRADE (TANK 19)
Key Capabilities
3D laser scanning & site verification
Piping design & route optimisation
Offsite fabrication, testing & galvanising
Pipe support design & installation
Live-site installation & integration
Overview
Vecta delivered the design, fabrication and installation of a replacement foam suppression line at a Major Hazard Facility terminal in Melbourne. Using 3D laser scanning, detailed piping design and offsite prefabrication, the project was completed efficiently within a constrained live operating environment. Approximately 100 metres of new pipework was installed with minimal disruption, no field welding and no safety incidents.